Problem this analyzer addresses
Construction projects lose money when labor drift, delay days and material overrun are not priced before execution.
What you get
Construction Overrun Decision Report with threshold alerts, hidden drivers and export-ready output.
What this analyzer helps decide
Use this analyzer when you need to decide whether current inputs sit inside acceptable exposure bands, which driver to investigate first, and whether to reprice, reschedule or redesign before repeating the work.
What the report includes
- Executive summary with threshold status
- Hidden loss driver breakdown
- Suggested actions and assumption notes
- Export-ready PDF and CSV on paid access
Assumptions used
- Delay cost = daily site cost × delay days.
- Overrun costs apply percent drift to labor and material budgets separately.
- Total exposure sums delay, labor overrun and material overrun — no double-count with change-order fees.
FAQ
- What does this analyzer measure?
- Construction Project Overrun Analyzer measures hidden loss exposure and operating drivers from the inputs you provide, with threshold interpretation against stated bands.
- What is included in the premium decision report?
- The decision report includes executive summary, hidden driver breakdown, threshold check, suggested actions, assumption notes and export-ready output on paid access.
- Is this a replacement for ERP or professional advice?
- No. SectorCalc is a calculator and decision-report layer. It does not replace ERP, accounting systems or professional financial, legal or engineering advice.