SectorCalc
  • Outils
  • Secteurs
  • Catégories
  • Rapports
  • Tarifs
LoginGet Pro
  • Outils
  • Secteurs
  • Catégories
  • Rapports
  • Tarifs
  • Login

Job risk check

CNC OEE & Time Loss Report

Check lost machine time, setup losses, scrap, tool wear and machine-hour cost before you price or repeat the job.

Where money is usually lost

Money is usually lost in downtime, setup overrun and scrap before it shows in the quoted machine rate.

What the paid report shows

The paid report turns your job numbers into a clear check before quoting, repeating or committing to the work.

Money at risk

Primary exposure total from your job inputs

Status check

Safe, watch or risky on the main drivers

Job file output

Save PDF/CSV for the team, client or job folder

This analyzer also breaks out

  • Lost machine time
  • Setup and downtime impact
  • Scrap and tool wear cost
  • Machine-hour cost risk
  • What to check before scheduling

The sample report shows report layout and section structure—it is not calculated from your inputs on this page.

View sample reportGet full job reportSave PDF/CSV report

How this check works

Why this check matters

This analyzer is built around job numbers that usually move margin: material waste, rework, labor time, waiting time, finishing cost and the gap from target rates.

Example scenario

Sample case — not a customer result

Job type
CNC milling cell — 120-part run, weekly schedule
Main input numbers (sample)
  • Machine rate: $85/hr
  • Setup time: 90 minutes
  • Downtime: 6% of planned hours
  • Scrap rate: 4%
  • OEE: 72%
What the analyzer flags
  • Lost machine time from downtime
  • Setup burden on a short run
  • Scrap and tool wear cost
What to check first
  • Setup sheet and first-off inspection time
  • Tool life and changeover on this material
  • Whether quoted machine hours include downtime
What the report helps you decide
Show whether setup, downtime or scrap is the main loss driver before you schedule or reprice the job.

How the estimate is built

The analyzer uses the numbers you enter, compares them with your target or expected range, and estimates where the job may lose money. It is a job check, not a guarantee.

Numbers used

Sample inputs above are illustrative only. Your report uses the numbers you enter on this page and the assumption notes listed below.

What to check before using the result

Match inputs to your job file, quote sheet or shop floor records. If a cost item is missing or the result does not match your field experience, send tool feedback before relying on the output.

Does this formula fit your job?

Tell us if a cost item is missing or the result does not match your field experience. We use field feedback to improve formulas, cost items and sector fit.

Send tool feedback

Job inputs

Enter your job numbers

Use numbers from the job file, quote sheet or shop floor—not estimates from memory.


$/h

Loaded shop rate including operator burden.

h

Setup plus production hours on the job.

h

Tool changes, first-off inspection, minor stops.

$

Stock, fixturing consumables for the job.

%

Historical scrap percent for similar jobs.

%

Running time vs planned time.

%

Actual cycle vs ideal cycle.

%

Good parts vs total parts.

$

Price you plan to charge the customer.

Does this formula fit your job?

Tell us if a cost item is missing, the result looks off, or your sector needs a different setup.

When to use this analyzer

Before quoting CNC work when setup time, downtime, scrap or machine-hour cost may be underpriced.

Verwendete Annahmen

  • Hidden buffers include setup overrun, tool wear and inspection load.
  • P90 uses sector volatility 22% unless you override shop history.
  • Outputs are estimates — verify before signing the job.
Zugehörigen Gratis-Rechner öffnen: Unit Cost CalculatorAutoritätsleitfaden: How to Calculate Manufacturing CostRechner in dieser Kategorie vergleichenBranchenrechner durchsuchenGet full job report

FAQ

Was misst dieser Analysator?
Machine rate, downtime, scrap, OEE and total money at risk from the numbers you enter.
Was enthält der Premium-Entscheidungsbericht?
Der Entscheidungsbericht enthält Management-Zusammenfassung, versteckte Treiber, Schwellenprüfung, empfohlene Maßnahmen, Annahmenotizen und exportfähige Ausgabe bei kostenpflichtigem Zugang.
When should I use the paid report?
Use it before quoting a high-value job, repeating work with weak margin, or reviewing a job where scrap, rework, waiting time or waste may be underpriced.
Ersetzt das ERP oder professionelle Beratung?
Nein. SectorCalc ist eine Rechner- und Entscheidungsberichtsschicht. Es ersetzt kein ERP, keine Buchhaltungssysteme oder professionelle Finanz-, Rechts- oder Ingenieurberatung.
Are these real customer results?
No. Sample cases on this page are example scenarios used to show how the analyzer works. Real customer case studies will be labeled separately when available.
Can I trust the result?
Use it as a structured job check. The result depends on the numbers you enter and the real job conditions. It does not replace ERP, accounting, engineering or professional advice.
What if the formula does not fit my sector?
Send tool feedback from the page. We use field feedback to improve formulas, cost items and sector fit.

SectorCalc

Sector-specific calculators, measurement tools and decision reports.

SECTORS

  • Manufacturing
  • Logistics
  • Construction
  • All 27 Sectors

COMPLIANCE

  • Privacy Policy
  • Terms of Service
  • Disclaimer
  • ISO 27001 Ready
  • SLA: 99.9% Uptime

AUTHORITY

Built for the shop floor.

  • Personal Data Vault →

© 2026 SectorCalc. All rights reserved.